Isometric drawing of a residential building separated into its roof, facade, interior and site layers.

PACT & RAD Conversion Advisory

From pre-award through stabilization. We build the operations narrative for your RFP response, pressure-test the conversion plan, and stay through the messy first year.

Sheet MD-201
Where this sits
MD-201Sheet
Pre-award → stabilizationStage
3Triggers
New York CityMarket

Run on live portfolios, not advised on from a distance.

The operations case — before the award, and after it.

A conversion that residents, agencies, and lenders experience as controlled.

The operations case is the part of a PACT response reviewers read last and remember first. We write it with you — the staffing model, the work-order flow, the vendor bench, the resident communication plan — and then pressure-test the conversion plan against it, because a narrative that cannot survive year one is not worth winning on. Through closing and into stabilisation we stay on it, so the people who wrote the plan are the ones watching it meet the building.

Isometric drawing of an upright planning board carrying a grid of pinned cards linked by connector lines.

You'd call us when .1

All three are the same gap at three different moments: the deal has moved ahead of the operating plan.

  1. 01

    You're assembling a PACT proposal and operations is your weakest section.

  2. 02

    Your closing date is set and your day-one plan isn't.

  3. 03

    Year one is producing findings faster than answers.

← All six services

Bring us the deal, the deficiency, or the decisions you're stuck on.

Let's work it through.

Work it through

One business day to a reply3,500+ units advised & operated25 years in NYC