We've sat on both sides of the violations notice. We know what actually gets it dismissed.

HPD, DOB and HUD findings; NSPIRE readiness; the monthly report to NYCHA. Four kinds of trouble, three checklists, and the calendar they all run on.

New York, NY
Sheet MD-400
Compliance & readiness
MD-401–403Checklists
4Agencies — HPD, DOB, HUD, NYCHA
1 Feb 2027NSPIRE — voucher programs
1 Jan 2027HOTMA compliance date

Dates as published by HUD at the time of issue. The calendar below carries the rest.

Findings, prepared for. Violations, run to ground.

Four kinds of trouble arrive from four directions and none of them queues. A city violation runs on its own clock, a HUD finding on the contract administrator's, an inspection score on whenever the inspector turns up. What they have in common is that none of them clears itself — and that each one has a specific thing that actually closes it.

  1. Area 01HPD · DOB

    HPD & DOB violations

    Classification, cure, certification of correction, and dismissal — sequenced so penalties stop accruing.

    Compliance & Violations
  2. Area 02HUD

    HUD findings

    Management and Occupancy Review prep and responses across all four areas: tenant files, income verification (EIV), payment accuracy (HAP), and physical condition.

    Compliance & Violations
  3. Area 03HUD · NSPIRE

    NSPIRE readiness

    HUD's inspection standard replaced HQS/UPCS — we prep buildings and teams for how units are actually scored now.

    The readiness walk-through
  4. Area 04NYCHA · HUD

    Post-conversion compliance builds

    The full calendar, file system, and SOPs a converted building needs from day one.

    The first ninety days

Conversion changes the rulebook. Here's the shape of it.

Nothing about the building changes on closing day. Everything about how it is measured does. The table below is the shape of that shift, not legal guidance — specifics vary by contract and by agency.

Area Before conversion (Section 9) After conversion (Project-Based Section 8)
Physical inspections Public-housing inspection standards, scored at the development level on the housing authority's cycle. NSPIRE inspections under the HAP contract — unit-level scoring, tighter life-safety timeframes, results that follow the owner.
Income certifications Annual reviews processed under public-housing rules in the authority's systems. Project-based Section 8 certifications — new verification requirements, new software, and the owner responsible for clean files.
Rent calculation Rent set under the public-housing formula and collected by the authority's processes. Residents typically pay 30% of adjusted gross income; contract rent and subsidy flow through monthly HAP vouchering.
Waitlist & admissions Housing-authority waitlist and admissions process. Waitlist and admissions administered under the HAP contract, with new screening, preference, and lease-up rules.
Oversight & reporting Public-housing authority oversight and reporting. HUD contract administration — MORs, monthly vouchering, and audit-ready documentation on a fixed calendar.

Program specifics vary by contract and agency — this table shows the shape of the shift, not legal guidance.

Three checklists worth working through.

These are the lists we run on site, not summaries of the regulation. Each one is a page you can print, carry into a building and mark up.

Isometric drawing of an open stepladder with a gold top cap.

NSPIRE Readiness Walk-Through

The pre-inspection sweep we run before HUD's inspectors do — life safety, units, systems, site, and the files.

Isometric drawing of a spiral-bound proposal volume with one gold index tab.

The Operations Section of a PACT Proposal

The questions worth having answered before the deadline — staffing, management approach, resident engagement, compliance capability, transition.

Isometric drawing of a marker post banded in three, the lowest band gold.

First 90 Days After a PACT Closing

Day one through stabilization, in three 30-day tranches — what has to be running, and when.

What's on the wall, and when.

Two dates are fixed and one comes round every month. None of them moves because a building is busy, and none of them is satisfied by having read about it.

  1. 1 Jan 2027HOTMA compliance date, Sections 102 and 104 — the income and asset rules, and every recertification that follows them.
  2. 1 Feb 2027NSPIRE compliance date for HCV, PBV and Mod Rehab — the inspection standard project-based voucher units are scored on. Project-based rental assistance is under NSPIRE already.
  3. MonthlyHAP vouchering, and the PACT oversight report to NYCHA — work orders, tenancy proceedings, construction progress. From the first month after closing.
  4. AnnuallyEvery household recertified, and the Management and Occupancy Review on the contract administrator's cycle.

Dates as published by HUD at the time of issue. The compliance service — Sheet MD-204 →